May
26
2009
Now it starts, rescheduling the launch date…..
At least a partly reason was the fact that 3 or 4 keelplanks or parts of them and two pair of frames has to be changed. Frames are already installed and also two plank ends on the starboard side. One or two remains to be done during this week. One of those may change to just fitting a dutchman.
Mast is out and ready to be worked on. Maybe already next week?
Comments Off on Have to adjust the launch date | tags: kaari, kölilauta, masto, moottori, potkurinakseli, vannasputki, vesillelasku | posted in Johanna
May
9
2009
Two pairs of frames are removed. The other was steel, the other oak. Steelframes were badly damaged by corrosis, probably due to prop shaft tube which had a connection with the frames (it was bronze). Oak frames were pretty soft in the lowest parts since they got wet by water which creeped in thru the tube.
First pair of frames is done, the other pait is ready within next few days. After that the bilge needs to be impregnated. One or two plank ends will be replaced, here is the first one away:
The engine bed parts are taking shape, work progresses quit slowly since I do not want to work the steel inside the boat due to fire hazard. The thrust bearing support has been measured to it’s place and two holes drilled to the steel frames to mark it’s position.
Comments Off on Hole in the hull | tags: kaari, kölilauta, laho, moottoripeti, moottoripukki, teräskaari, vannasputki | posted in Johanna